-===== Retrofitting a 1991 Marine Trader Boat with Modern Electronics =====+===== Retrofitting a 1991 Marine Trader Boat with Modern Electronics =====  
 +{{ :20220217_143538_-_copy.jpg?600 |}} 
 + 
 +===== Project will begin as soon as we get better weather.  Boat is in South Carolina ===== 
  
 ===== Project Overview ===== ===== Project Overview =====
Line 6: Line 10:
 ===== Key Upgrades ===== ===== Key Upgrades =====
   * **OpenCPN Integration**: Installing and configuring OpenCPN on Raspberry Pi systems for advanced navigation capabilities.   * **OpenCPN Integration**: Installing and configuring OpenCPN on Raspberry Pi systems for advanced navigation capabilities.
-  * **Analog to Digital Conversion**: Upgrading all analog instruments to digital systems for improved accuracy and reliability.+  * **Analog to Digital Conversion**: Upgrading all analog instruments to digital gateway systems for improved accuracyreliability, and integration to OpenCPN Dashboard.
   * **Custom Dashboards**: Creating tailored digital dashboards in OpenCPN to display all vital information at a glance.   * **Custom Dashboards**: Creating tailored digital dashboards in OpenCPN to display all vital information at a glance.
   * **Autopilot Modification**: Enhancing the existing autopilot system for better performance and integration with other systems.   * **Autopilot Modification**: Enhancing the existing autopilot system for better performance and integration with other systems.
   * **AIS Installation**: Adding an Automatic Identification System for improved safety and situational awareness.   * **AIS Installation**: Adding an Automatic Identification System for improved safety and situational awareness.
-  * **GPS Upgrade**: Installing a new, high-precision GPS system for accurate positioning.+  * **GPS Upgrade**: Installing a new, high-precision GPS for accurate positioning.
   * **Sensor Integration**: Connecting and calibrating various sensors throughout the vessel.   * **Sensor Integration**: Connecting and calibrating various sensors throughout the vessel.
   * **Network Setup**: Establishing a robust wired and wireless network for seamless communication between all systems.   * **Network Setup**: Establishing a robust wired and wireless network for seamless communication between all systems.
Line 30: Line 34:
 Are you inspired to upgrade your own vessel? Whether you have a classic boat in need of a complete overhaul or a modern vessel requiring fine-tuning, our team of experts is here to help. Contact us today for a consultation and take the first step towards a fully integrated, state-of-the-art marine electronics setup! Are you inspired to upgrade your own vessel? Whether you have a classic boat in need of a complete overhaul or a modern vessel requiring fine-tuning, our team of experts is here to help. Contact us today for a consultation and take the first step towards a fully integrated, state-of-the-art marine electronics setup!
  
-===== Project Timeline ===== +^ Week ^ Task ^ Description ^ 
-  * **Initial Assessment** +| 1 | Initial Assessment Complete the vessel survey and create detailed upgrade plan. | 
-    * Week 1: Complete vessel survey and create detailed upgrade plan. +| 2 | Analog to Digital Conversion |Analog instruments connect to I2C network | 
-  * **Analog to Digital Conversion** +| I2C Network Integration | Connect to Signal K Datum Server | 
-    * Week 2-3: Begin replacing analog instruments with digital counterparts. +| 4 | OpenCPN Setup Install and configure OpenCPN on Raspberry Pi systems. | 
-  * **OpenCPN Setup** +| 5 | AIS and GPS Installation | Install new AIS and GPS systems for improved navigation and safety. | 
-    * Week 4: Install and configure OpenCPN on Raspberry Pi systems. +| 6 | Sensor Integration Connect and calibrate new digital sensors throughout the vessel. | 
-  * **Sensor Integration** +| 7 | Autopilot Modification Upgrade and integrate the autopilot system. | 
-    * Week 5: Connect and calibrate new digital sensors throughout the vessel. +| 8 | Network Setup Establish robust wired and wireless networks for all systems. | 
-  * **Autopilot Modification** +| 9 | Dashboard Creation Design and implement custom digital dashboards in OpenCPN. | 
-    * Week 6: Upgrade and integrate the autopilot system. +| 10 | Final Testing and Calibration Comprehensive testing of all systems and final adjustments. |
-  * **AIS and GPS Installation** +
-    * Week 7: Install new AIS and GPS systems for improved navigation and safety. +
-  * **Network Setup** +
-    * Week 8: Establish robust wired and wireless networks for all systems. +
-  * **Dashboard Creation** +
-    * Week 9: Design and implement custom digital dashboards in OpenCPN. +
-  * **Final Testing and Calibration** +
-    * Week 10: Comprehensive testing of all systems and final adjustments.+